Question
Download Solution PDFWhich thermal pollution reduction method is the most costly to build and operate?
Answer (Detailed Solution Below)
Option 4 : Dry Tower
Detailed Solution
Download Solution PDFThe correct answer is - Dry Tower
Key Points
- Dry Tower
- Requires extensive and specialized construction, driving up initial costs significantly.
- Operational costs are higher due to the need for advanced maintenance and energy consumption.
- Often involves sophisticated technology to ensure efficient thermal pollution reduction.
- Cost considerations include not just construction but also long-term operational and maintenance expenses.
Additional Information
- Cooling Tower
- While also costly, cooling towers are generally less expensive to build and operate compared to dry towers.
- They use water to dissipate heat, which can be more efficient in terms of energy use.
- Sprinkler Tower
- Typically involves lower construction and operational costs compared to dry towers.
- Uses a system of sprinklers to cool water, which is less technologically intensive.
- Large Shallow Ponds
- Generally the least costly option, involving minimal technological intervention.
- Relies on natural processes for cooling, leading to lower operational costs.