The peak load is ________ the base load.

This question was previously asked in
SSC JE Electrical 15 Nov 2022 Shift 2 Official Paper
View all SSC JE EE Papers >
  1. below
  2. over and above
  3. equal to
  4. part of

Answer (Detailed Solution Below)

Option 2 : over and above
Free
RRB JE CBT I Full Test - 23
14.3 K Users
100 Questions 100 Marks 90 Mins

Detailed Solution

Download Solution PDF

The correct answer is option 2.

Base Load

  • Base load is the minimum level of electricity demand required over a period of 24 hours.
  • Base loads are used to provide power to components that keep running at all times.
  • Plants that are running continuously over extended periods of time are said to be base load power plants.
  • Examples of base power plants are thermal plants, hydro plants, and nuclear plants.

Peak Load

  • Peak load is the highest amount of energy that a consumer draws from the grid in a set period of time.
  • The peak load is always over and above the base load.
  •  A power plant that supplies electricity during the hours of peak load only is called a peak load power plant.
  • Examples of peak-load power plants are solar plants, diesel plants, and biogas plants.
Latest SSC JE EE Updates

Last updated on Jun 16, 2025

-> SSC JE Electrical 2025 Notification will be released on June 30 for the post of Junior Engineer Electrical/ Electrical & Mechanical.

-> Applicants can fill out the SSC JE application form 2025 for Electrical Engineering from June 30 to July 21.

-> SSC JE EE 2025 paper 1 exam will be conducted from October 27 to 31. 

-> Candidates with a degree/diploma in engineering are eligible for this post.

-> The selection process includes Paper I and Paper II online exams, followed by document verification.

-> Prepare for the exam using SSC JE EE Previous Year Papers.

More Peak Load Power Station Questions

Get Free Access Now
Hot Links: teen patti - 3patti cards game teen patti winner teen patti wala game teen patti gold real cash teen patti joy apk